Heavy haul in Ohio, our home state
Ohio Heavy Haul Carrier
Reliable Transport LLC is a heavy haul, oversize and overweight carrier with its office and yard at 7660 W Third St in Dayton, OH 45417. Our own trucks, drivers and permit team move transformers, gensets, machinery and superloads across Ohio, and from here across the USA and Canada.
This page is general information only, not legal advice and not a permit. Rules change often and each state's permit and official rules are the final word. Always confirm limits, escorts, routes and travel times with the state permit office before moving a load. Reliable Transport LLC is not responsible for decisions made using this information.
Reliable Transport LLC
Our home base
Our office and yard sit at 7660 W Third St on the west side of Dayton, a short run from the spot north of the city where I 75 meets I 70. From here a load can head north toward Toledo and Michigan, south toward Cincinnati and Kentucky, east toward Columbus and Pennsylvania, or west toward Indiana. (ODOT statewide study, Dayton to Cincinnati corridor, I 75 in Ohio)
We are USDOT 3906954 and MC 1441035. Permitting, routing, escorts, utility bucket trucks, maintenance and drivers are all in house, and every truck runs Live GPS Samsara tracking and dash cam. We are a carrier with our own trucks and drivers, not a broker.
Hauling through other states? Use our permit map and route planner
Open the route plannerFeatured Ohio move
Early 2024- Freight
- Power transformer, 150,000 lbs
- Gross weight
- 240,000 lbs
- Loaded height
- 16'H
- Route
- Pocatello, ID to Akron, OH
- Support
- The Ohio State Highway Patrol helped with wider turns to avoid overpasses and low cables.
- Offload
- The customer's crane crew
- When
- Early 2024
Moves we have made
A 150,000 lb transformer into Akron
In early 2024 we moved a 150,000 lb power transformer from Pocatello, Idaho to Akron, Ohio. The move weighed 240,000 lbs gross and stood 16'H loaded.
Ohio's legal height limit is 13'6"H, and ODOT says any load taller than 14'10"H must be coordinated with the owners of overhead signs, signals and utilities before it moves.
In Ohio, some turns had to be taken wide to avoid overpasses and low cables. The Ohio State Highway Patrol helped us make those wider turns, and the customer's crane crew handled the offload in Akron.
Sources: ODOT permit conditions (OS 1A); ODOT legal limits (OS 8).
Moves we have made in Ohio
A 160,000 lb transformer to Obetz
In December 2024 we delivered a 160,000 lb power transformer to Obetz, in Franklin County on the southeast edge of Columbus. Our own permitting team handled the permits.
That piece alone weighed twice the 80,000 lb gross limit for a whole truck on the Interstate system, so it moved on an overweight permit with enough axles under it to keep every axle group inside the permit. Franklin County is also one of the Ohio counties where loads over 12'W stay off the road during weekday rush hours.
Sources: 23 CFR 658.17; ODOT permit conditions (OS 1A).


Our fleet
Equipment for Ohio's heaviest loads
Every Ohio load runs on our own trucks and trailers, out of our Dayton yard.
16 trucks
All 2025 or newer, custom specced for heavy haul and superload weights and maintained in house.
40 trailers
Setups from 8 to 22 axles, so the axle count and spread match the piece and the permit.
19 axle, 150 ton trailer
Our heaviest setup takes loads up to 300,000 lbs.
90 ton perimeter trailer
For gensets and transformers only. The basket expands to 18'6" wide and carries up to 180,000 lbs, or about 130,000 lbs at a 65 ft well.
Long well setups
Cranes ride on our long well setups.
Escorts and bucket trucks
Our own escort vehicles and utility bucket trucks travel with tall and wide loads.
Across Ohio
Ohio corridors and project sites
What shapes a heavy haul route across Ohio right now. Each fact is linked to its source and confirmed by a second one.
I 70 and I 75 at Dayton
I 75 meets I 70 just north of Dayton, near Dayton International Airport, Vandalia and Huber Heights, so our yard sits at the crossing of Ohio's main north and south and east and west Interstates. (ODOT statewide study, I 75 in Ohio)
Central Ohio superloads
Starting in 2024, nearly two dozen superloads moved from an Ohio River dock near Manchester to the Intel site in New Albany, on a route ODOT planned. The four largest weighed about 916,000 lbs and measured about 23'H, 20'W and 280'L, and overhead signs, signals and utility lines along the route were adjusted for them. (ODOT bulletin, second of four extra large loads, ODOT bulletin, last of four extra large loads)
Ohio River crossing at Cincinnati
Work on a companion bridge to the Brent Spence Bridge, which carries I 71 and I 75 over the Ohio River between Cincinnati and Covington, Kentucky, began in 2026, with the new bridge expected to open in 2031. Ramps near downtown are being closed and moved during the work, so Cincinnati routes change often. (Brent Spence Bridge Corridor, Kentucky Transportation Cabinet)
River and lake ports
The Ports of Cincinnati and Northern Kentucky cover 226.5 miles of the Ohio and Licking rivers, with more than 70 active terminals. On Lake Erie, we cover the Port of Cleveland and the Port of Toledo on their own pages. (ODOT port profile, Port of Greater Cincinnati)
More of our moves
Heavy loads we have hauled

207,000 lb dryer drum
Louisville, KY to Richmond, VA in December 2025, at 300,000 lbs gross and 165'L x 13'6"W x 17'H loaded, with a crew of 15.

110,000 lb switchgear building
Houston, TX to Los Angeles, CA in 2025, at 250,000 lbs gross and 185'L x 17'W x 17'H loaded.
220,000 lb submarine engine
Within Missouri in January 2025, at 320,000 lbs gross and 136'L x 10'W x 16'H loaded.
Moving a load in Ohio?
Send the weight, dimensions and route, and we will plan the move.
Request a quote →See every move on our Moves page.
Ohio permits in plain English
What Ohio asks of a heavy load
These Ohio rules shape a heavy haul route. Our permitting team checks the current rules for every state on your route. The full list, with every source, is on our Ohio oversize permit rules page.
Permit and escort rules
Official sources linked| Topic | Rule |
|---|---|
| Legal limits | Without a permit, a load in Ohio can be up to 8'6"W and 13'6"H, at up to 80,000 lbs gross. (ODOT OS 8) |
| Length escort | A load over 90'L needs one rear escort. (ODOT OS 1A) |
| Width escort | A load over 13'W needs one lead escort, or one rear escort on multiple lane highways. (ODOT OS 1A) |
| Height escort | A load over 14'6"H needs one lead escort with a height sensing device. (ODOT OS 1A) |
| Lead and rear | A load over 14'6"W or over 14'10"H needs one lead and one rear escort. The same applies when a load meets more than one of the length, width and height conditions above. (ODOT OS 1A) |
| Police escorts | ODOT may also require private or police escorts at its discretion, and when it does, the requirement is written on the permit. A police vehicle does not count as a private escort unless the permit says so. (Ohio Administrative Code, permit conditions rule; ODOT OS 1A) |
| Overhead clearance | A load over 14'10"H must be coordinated with the owners of all overhead signs, signals and utilities on the route. (ODOT OS 1A) |
| Travel hours | Permitted loads move in daylight, from one half hour before sunrise until one half hour after sunset. Overweight loads within legal dimensions have no hour or day limits as long as they do not obstruct normal traffic. (ODOT OS 1A) |
| Rush hours | Loads over 12'W may not move from 6:30 to 9:00 a.m. or 4:30 to 6:00 p.m., Monday through Friday, in the counties ODOT lists on form OS 1A. (ODOT OS 1A) |
| Rush hour counties | The list includes Montgomery (Dayton), Franklin and its neighbors Delaware, Fairfield, Licking, Madison, Pickaway and Union (Columbus), Hamilton, Butler, Warren and Clermont (Cincinnati), Cuyahoga (Cleveland) and Lucas (Toledo), 22 counties in all. (ODOT OS 1A) |
| Weekends | Loads over 12'W may not move from 3 p.m. on Saturday or Sunday until one half hour before sunrise the next day. From April 1 through November 30, the same applies from 3 p.m. on Friday. (ODOT OS 1A) |
| Holidays | Permitted loads may not move from noon the day before a designated holiday until sunrise the day after, unless the permit says otherwise. For the rest of 2026: Thanksgiving, noon November 25 to sunrise November 27; Christmas, noon December 24 to sunrise December 28. Overweight only loads with a valid permit may move. (Ohio Administrative Code, permit conditions rule; ODOT OS 1A; ODOT hauling permits holiday notice) |
Rules change. We checked these rules on October 1, 2026 and again on October 9, 2026 against ODOT form OS 1A (Rev. 01/18), form OS 8, the ODOT hauling permits site and the permit conditions rule in the Ohio Administrative Code, and each one against a second source. Our permitting team confirms the current rules for every move.
What we offer
Heavy haul services in Ohio
Neighboring states
Where we haul
Ohio cities we serve
Each page covers local permit rules, routing and escorts for heavy loads in that city.
Plan the equipment handoff in Ohio
A transformer, generator and industrial machine do not need the same delivery brief. Use Ohio transformer transport for the drawing and receiving crane discussion, Ohio generator transport for genset configuration and site access, and Ohio superload transport for complex route planning.
Our home base is Dayton. Our published Akron transformer move and Obetz transformer delivery show actual Ohio work. Other city pages describe service areas, not additional offices.
Check Ohio permit requirements before planning travel windows and request a load specific route review. Send a heavy haul quote request.
Questions
Ohio heavy haul questions
Do you haul out of Dayton, Ohio?
Yes. Our office and yard are at 7660 W Third St in Dayton, OH 45417, and we haul from here across Ohio, the USA and Canada.
Who issues Ohio oversize permits?
ODOT issues special hauling permits through its Ohio Hauling Permits System and its Special Hauling Permits office at 1980 West Broad Street in Columbus. Our in house team files them for every load we haul.
When does an Ohio load need escorts?
Under ODOT form OS 1A, a load over 90'L needs a rear escort, a load over 13'W needs a lead escort (a rear escort on multiple lane highways), and a load over 14'6"W or over 14'10"H needs a lead and a rear escort.
Can wide loads move at rush hour in Ohio?
Not in the 22 counties ODOT lists on form OS 1A, which include Montgomery, Franklin, Hamilton, Cuyahoga and Lucas. There, loads over 12'W may not move from 6:30 to 9:00 a.m. or 4:30 to 6:00 p.m., Monday through Friday.
Can oversize loads move on Ohio holidays?
No. Oversize loads stop from noon the day before a holiday until sunrise the day after. For Thanksgiving 2026 that is noon November 25 to sunrise November 27, and for Christmas noon December 24 to sunrise December 28. Overweight only loads with a valid permit may move.
Have you hauled transformers in Ohio?
Yes. In December 2024 we delivered a 160,000 lb power transformer to Obetz, near Columbus, and in early 2024 we hauled a 150,000 lb transformer from Pocatello, Idaho to Akron, Ohio, at 240,000 lbs gross and 16'H loaded.
What equipment do you run?
16 trucks, all 2025 or newer, and 40 trailers in setups from 8 to 22 axles, including a 19 axle 150 ton trailer and a 90 ton perimeter trailer for gensets and transformers.
How heavy a load can you haul?
Our superload service handles loads up to 300,000 lbs, with permits, routing and escorts by our own team.
Hauling through other states? Use our permit map and route planner
Open the route plannerOhio heavy haul quote
Ready to move it?
Send the weight and dimensions, the pickup and delivery points, and your dates. We will work out the permits, route, escorts and equipment.
This page is general information only, not legal advice and not a permit. Rules change often and each state's permit and official rules are the final word. Always confirm limits, escorts, routes and travel times with the state permit office before moving a load. Reliable Transport LLC is not responsible for decisions made using this information.