
Heavy haul in Michigan
Heavy Haul Trucking in Michigan
Reliable Transport LLC runs heavy haul and superload moves in Michigan, with permits, routing and escorts arranged for each load. We are based in Dayton, Ohio, and we haul across the USA and Canada.
This page is general information only, not legal advice and not a permit. Rules change often and each state's permit and official rules are the final word. Always confirm limits, escorts, routes and travel times with the state permit office before moving a load. Reliable Transport LLC is not responsible for decisions made using this information.
Reliable Transport LLC
Michigan loads, planned for each move
We are USDOT 3906954 and MC 1441035. Permits are arranged in every state on the route, including MDOT permits for Michigan, with routing and escorts arranged for each load.
Hauling through other states? Use our permit map and route planner
Open the route plannerMichigan at a glance
MDOT- Legal size
- 8'6"W designated, 13'6"H
- Single trip permit
- Up to 16'W, 15'H, 150'L
- Travel
- Daylight, Monday through Friday
- Weekends
- Up to 10'W, 14'H, 90'L
- Spring limits
- No overweight, nothing over 14'W
- Superload
- Over 16'W, 15'H or 150'L
Before the move
How we plan a Michigan load
Every Michigan move starts with the MDOT special transport permit, ordered through MiTRIP. We check the size, weight and route against MDOT's rules, then follow the escort, sign and travel provisions printed on the permit.
Michigan permits run in daylight, Monday through Friday, and spring weight restrictions stop overweight moves. We build the schedule to fit those windows and the holiday bans.
The MDOT permit covers state trunklines only, so we plan county and city legs with the local authority.
Sources: MDOT T 2; MDOT permit provisions; MDOT oversize/overweight questions.
Transformers
Transformer hauling in Michigan
We are an asset based carrier based in Dayton, Ohio, MC 1441035. We haul transformers from 70,000 to 300,000 lb on 8 to 22 axle setups, anywhere in the USA and Canada, including Michigan. 300,000 lb means the transformer alone, not combined gross.

The Pocatello, Idaho to Akron, Ohio transformer move is also published. Piece weight is not stated on that move. We have no published Michigan transformer job to show here.
Read our Ohio transformer transport page and send the drawing, weight and route on our quote form. For a Detroit delivery or pickup, see heavy haul in Detroit. Michigan permit rules are on Michigan oversize permits. Our home state hub is heavy haul in Ohio, and Ohio permit context is on Ohio oversize permits.
Gensets
Genset and generator hauling in Michigan
We haul generators and genset enclosures on 8 to 22 axle setups from our Dayton, Ohio yard, including Michigan work and moves that continue into Canada.

The only storage we offer is at our Dayton yard, and only when we can accept the unit. There is no Michigan storage yard. See genset storage in Dayton, Ohio and generator transport in Ohio, then send unit count, dimensions, weight and dates on our quote form.
Our moves
Heavy loads we have hauled

Pocatello to Akron transformer
Pocatello, ID to Akron, OH in early 2024, at 240,000 lbs gross and 16'H loaded, with help from the Ohio State Highway Patrol. Piece weight is not stated. We haul transformers from 70,000 to 300,000 lb on 8 to 22 axle setups, and 300,000 lb means the transformer alone.

207,000 lb dryer drum
Louisville, KY to Richmond, VA in December 2025, at 300,000 lbs gross and 165'L x 13'6"W x 17'H loaded, with a crew of 15.
Moving a load in Michigan?
Send the weight, dimensions and route, and we will plan the move.
Request a quote →See every move on our Moves page.
Michigan permits in plain English
What Michigan asks of a heavy load
These Michigan rules shape a heavy haul route. We check the current rules for every state on your route. The full list, with every source, is on our Michigan permit rules page.
Permit and escort rules
Official sources linked| Topic | Rule |
|---|---|
| Legal limits | Without a permit, a load in Michigan can be up to 8'6"W on designated highways (8'W elsewhere) and 13'6"H, with weight set by axle loadings. (MDOT T 1, maximum legal truck loadings and dimensions, Michigan Vehicle Code 257.717, width) |
| Permit limits | A single trip permit covers loads up to 16'W, 15'H and 150'L, for 5 days. (MDOT T 2, movement of oversize or overweight loads, MDOT oversize/overweight questions) |
| Route survey | Over 13'6"H, the carrier verifies the route has been traveled for vertical clearance. A superload over 16'W, 15'H or 150'L needs a certified route survey on MDOT Form 2465 with the application. (MDOT T 2, movement of oversize or overweight loads, MDOT Form 2465, route survey certification) |
| Escorts | MDOT lists the escorts each move needs on the permit. (MDOT T 2, movement of oversize or overweight loads, MDOT permit provisions, conditions and restrictions) |
| Travel hours | Daylight only, Monday through Friday. (MDOT T 2, movement of oversize or overweight loads, MDOT permit provisions, conditions and restrictions) |
| Weekends | Loads up to 10'W, 14'H and 90'L may ask for weekend movement. (MDOT oversize/overweight questions) |
| Holidays | No movement from noon the day before the six major holidays until daylight the day after. (MDOT T 2, movement of oversize or overweight loads) |
| Spring limits | No overweight permits and nothing over 14'W during spring weight restrictions. (MDOT T 2, movement of oversize or overweight loads, MDOT oversize/overweight questions) |
| Local roads | The MDOT permit covers state trunklines only. (MDOT oversize/overweight questions, MDOT permit provisions, conditions and restrictions) |
Rules change. We checked these rules on October 1, 2026 against MDOT T 1 (05 2024), T 2 (10 2023), the MDOT permit provisions and questions pages and the Michigan Vehicle Code, and each one against a second source. We confirm the current rules for every move.
What we offer
Heavy haul services in Michigan
Where we haul
Michigan cities we serve
Detroit has its own page. The Port of Detroit has a new page as well. Other Michigan markets are served from our Dayton, Ohio yard and do not have their own pages yet.
Grand Rapids, Lansing, Flint, Ann Arbor, Kalamazoo, Saginaw and Midland are later candidates for their own pages, and only when there is a sourced local reason plus a real or owner confirmed lane. Monroe is covered as a short section on the Port of Detroit page, not as a standalone city page.
Questions
Michigan heavy haul questions
Do you haul heavy loads in Michigan?
Yes. We are based at 7660 W Third St in Dayton, OH 45417, and we haul oversize and overweight loads across the USA and Canada. We pull the Michigan permit for the Michigan part of the route.
When can oversize loads move in Michigan?
In daylight, Monday through Friday. Loads up to 10'W, 14'H and 90'L may ask for weekend movement.
Can you move heavy loads in Michigan in the spring?
Not on overweight permits during spring weight restrictions. We schedule heavy Michigan moves outside those dates.
How heavy a load can you haul?
We haul transformers from 70,000 to 300,000 lb on 8 to 22 axles, where 300,000 lb means the transformer alone, reviewed per load, with permits, routing and escorts arranged for each load.
Hauling through other states? Use our permit map and route planner
Open the route plannerMichigan heavy haul quote
Ready to move it?
Send the weight and dimensions, the pickup and delivery points, and your dates. We will work out the permits, route, escorts and equipment.
This page is general information only, not legal advice and not a permit. Rules change often and each state's permit and official rules are the final word. Always confirm limits, escorts, routes and travel times with the state permit office before moving a load. Reliable Transport LLC is not responsible for decisions made using this information.

