
Detroit, Michigan
Heavy Haul Trucking in Detroit
Oversize freight in and out of Detroit and across the border to Windsor, with MDOT and City of Detroit permits, bridge bookings and escorts arranged for each load.
This page is general information only, not legal advice and not a permit. Rules change often and each state's permit and official rules are the final word. Always confirm limits, escorts, routes and travel times with the state permit office before moving a load. Reliable Transport LLC is not responsible for decisions made using this information.
Detroit heavy haul
City, state and border crossing rules on one plan
Reliable Transport LLC runs heavy haul and superload moves across the USA and Canada from our home base in Dayton, Ohio. For a Detroit load, the MDOT permit and any local permit, the route and the escorts are arranged, and the bridge crossing is scheduled when the load goes on to Canada.
Hauling through other states? Use our permit map and route planner
Open the route plannerLocal rules
Detroit permits, curfews and bridges to Canada
Rules come from MDOT, the City of Detroit and the bridge operators. Each fact below is checked against a second source.
City of Detroit permit
Oversize and overweight loads on city streets need a City of Detroit load move permit, applied for on the DPW Traffic Engineering oversize/overweight vehicle traffic application, with a $1,500.00 surety bond that expires December 31. (City of Detroit oversize and overweight load move permit, City of Detroit oversize/overweight vehicle traffic application)
Wayne County rush hours
When the permit lists MDOT provision 15, there is no movement 7 to 9 a.m. or 3 to 6 p.m. in Wayne, Oakland, Macomb and 8 other counties. (MDOT permit provisions, conditions and restrictions)
Ambassador Bridge
Loads 9'W and wider schedule the crossing with the bridge, which runs a bridge escort for them. The bridge lists a maximum of 13'6"W, 14'H and 80'L. (Ambassador Bridge oversized and wide loads, Ambassador Bridge FAQs, Ambassador Bridge toll schedule, August 1, 2026)
Gordie Howe International Bridge
Open since July 27, 2026, the bridge takes oversize and overweight loads. They need permits obtained in advance and carried on board, and a call to the bridge 24 hours before arrival. (Gordie Howe International Bridge specialized loads, Gordie Howe International Bridge, Know Howe Before You Go Howe, Gordie Howe International Bridge opening, July 27, 2026)
State trunklines only
The MDOT permit covers state trunklines only, so county and city legs need their own approval. (MDOT permit provisions, conditions and restrictions)
Sources: City of Detroit oversize and overweight load move permit; City of Detroit oversize/overweight vehicle traffic application; MDOT permit provisions, conditions and restrictions; Ambassador Bridge oversized and wide loads; Ambassador Bridge FAQs; Ambassador Bridge toll schedule, August 1, 2026; Gordie Howe International Bridge specialized loads; Gordie Howe International Bridge, Know Howe Before You Go Howe; Gordie Howe International Bridge opening, July 27, 2026.
Michigan rules
Detroit oversize rules at a glance
The Wayne County curfew first, then the MDOT rules every Detroit load runs under.
Detroit and Michigan
Official sources linked| Where | Restriction |
|---|---|
| Wayne County | When the permit lists provision 15: no movement 7 to 9 a.m. or 3 to 6 p.m. (MDOT permit provisions, conditions and restrictions) |
| Legal limits | Without a permit, a load in Michigan can be up to 8'6"W on designated highways (8'W elsewhere) and 13'6"H, with weight set by axle loadings. (MDOT T 1, maximum legal truck loadings and dimensions, Michigan Vehicle Code 257.717, width) |
| Permit limits | A single trip permit covers loads up to 16'W, 15'H and 150'L, for 5 days. (MDOT T 2, movement of oversize or overweight loads, MDOT oversize/overweight questions) |
| Escorts | MDOT lists the escorts each move needs on the permit. (MDOT T 2, movement of oversize or overweight loads, MDOT permit provisions, conditions and restrictions) |
| Travel hours | Daylight only, Monday through Friday. (MDOT T 2, movement of oversize or overweight loads, MDOT permit provisions, conditions and restrictions) |
| Holidays | No movement from noon the day before the six major holidays until daylight the day after. (MDOT T 2, movement of oversize or overweight loads) |
| Spring limits | No overweight permits and nothing over 14'W during spring weight restrictions. (MDOT T 2, movement of oversize or overweight loads, MDOT oversize/overweight questions) |
| Local roads | The MDOT permit covers state trunklines only. (MDOT oversize/overweight questions, MDOT permit provisions, conditions and restrictions) |
Rules change often. We checked these on October 2, 2026 against the official sources linked in each row, and each one against a second source. We confirm the current rules for every move.
Transformers
Transformer hauling in Detroit
We are an asset based carrier based in Dayton, Ohio, MC 1441035. We haul transformers from 70,000 to 300,000 lb on 8 to 22 axle setups, anywhere in the USA and Canada. 300,000 lb means the transformer alone, not combined gross.

The Pocatello, Idaho to Akron, Ohio transformer move is also published. Piece weight is not stated on that move. We have no published Michigan transformer job to show here.
Read our Ohio transformer transport page, then send the drawing, weight and the Detroit or Windsor delivery point on our quote form. Michigan permit rules are on our Michigan oversize permits page. Our home state hub is heavy haul in Ohio. Ohio permit context is on Ohio oversize permits.
Gensets
Genset and generator hauling in Detroit
We haul generators and genset enclosures on the same 8 to 22 axle setups, from our Dayton, Ohio yard, across the USA and Canada.

If a unit needs to be stored before or after the road move, the only storage we offer is at our Dayton yard, and only when we can accept the unit. See genset storage in Dayton, Ohio and generator transport in Ohio. Send unit count, dimensions, weight and dates on our quote form.
Port of Detroit
Ship to truck moves at the Port of Detroit
General cargo at the Port of Detroit is handled at terminals in Detroit, River Rouge and Ecorse. We plan the road move after the terminal releases the cargo. We do not have an office or a yard at the port, and we do not have a published Port of Detroit job to show here.
The full terminal picture, with official sources, is on our Port of Detroit heavy haul page. For city streets, rush hours and the bridges to Windsor, stay on this Detroit page and on Michigan oversize permits.
Our moves
Heavy loads we have moved
These moves ran on other routes. They show the size of loads we haul, with permits, routing and escorts arranged for each load.

Pocatello to Akron transformer
Pocatello, ID to Akron, OH in early 2024, at 240,000 lbs gross and 16'H loaded, with help from the Ohio State Highway Patrol. Piece weight is not stated. We haul transformers from 70,000 to 300,000 lb on 8 to 22 axle setups, and 300,000 lb means the transformer alone.

207,000 lb dryer drum
Louisville, KY to Richmond, VA in December 2025, at 300,000 lbs gross and 165'L x 13'6"W x 17'H loaded, with a crew of 15.

110,000 lb switchgear building
Houston, TX to Los Angeles, CA in 2025, at 250,000 lbs gross and 185'L x 17'W x 17'H loaded.
Moving something in Detroit?
Send the size and weight. We will tell you what the permit, route and escorts look like.
Request a quote →See every move on our Moves page.
Questions
Detroit heavy haul questions
Do I need a city permit for an oversize load in Detroit?
Yes, on city streets. The City of Detroit load move permit needs a $1,500.00 surety bond.
Can an oversize load cross to Windsor?
Yes, with the right permits and a booking with the bridge first. The Ambassador Bridge lists up to 13'6"W and 14'H, and the Gordie Howe International Bridge asks for a call 24 hours before arrival.
Are there rush hour limits in the Detroit area?
When the MDOT permit lists provision 15, no movement 7 to 9 a.m. or 3 to 6 p.m. in Wayne, Oakland and Macomb counties.
How heavy a load can you haul?
We haul transformers from 70,000 to 300,000 lb on 8 to 22 axles, where 300,000 lb means the transformer alone, reviewed per load, with permits, routing and escorts arranged for each load.
Hauling through other states? Use our permit map and route planner
Open the route plannerKeep planning
More for your Detroit move
Other city pages
Detroit heavy haul
Ready to move it?
Send the load dimensions, weight, pickup and delivery points. Permits, routing and escorts are arranged for each load, and we get back to you fast.
This page is general information only, not legal advice and not a permit. Rules change often and each state's permit and official rules are the final word. Always confirm limits, escorts, routes and travel times with the state permit office before moving a load. Reliable Transport LLC is not responsible for decisions made using this information.

