Black heavy haul tractor pulling a red crane carrier on a multi axle trailer

Heavy haul in Maryland

Heavy Haul Trucking in Maryland

Reliable Transport LLC permits, routes and escorts heavy haul and superload moves in Maryland with our own team. We are based in Dayton, Ohio, and we haul across the USA and Canada.

This page is general information only, not legal advice and not a permit. Rules change often and each state's permit and official rules are the final word. Always confirm limits, escorts, routes and travel times with the state permit office before moving a load. Reliable Transport LLC is not responsible for decisions made using this information.

Reliable Transport LLC

Maryland loads, planned in house

We are USDOT 3906954 and MC 1441035. Our in house permitting team pulls permits in every state on the route, including MDOT SHA hauling permits for Maryland, and our own escorts and utility bucket trucks run with the load.

Hauling through other states? Use our permit map and route planner

Open the route planner

Maryland permits in plain English

What Maryland asks of a heavy load

These Maryland rules shape a heavy haul route. Our permitting team checks the current rules for every state on your route. The full list, with every source, is on our Maryland permit rules page.

Permit and escort rules

Official sources linked
TopicRule
Legal limitsWithout a permit, a load in Maryland can be up to 102" (8'6"W) and 13'6"H, at up to 80,000 lbs. (MDOT SHA Overdimensional Permit Limitations)
EscortsOver 13'W or 85'L, 1 escort; 14'W or 140'L and over, 2 escorts. (COMAR 11.04.04.03, escorts, MDOT SHA Overdimensional Permit Limitations)
Police escorts16'W and over, or over 75 tons. (COMAR 11.04.04.06, police escort, MDOT SHA Overdimensional Permit Limitations)
HeightAt 14'6"H and over, a pole car and a signed height clearance route survey. (MDOT SHA Overdimensional Permit Limitations, MDOT SHA Hauling Permits, height surveys, COMAR 11.04.04.03, escorts)
Wide load curfew14'W and over, 9 a.m. to 3:30 p.m. (MDOT SHA Overdimensional Permit Limitations, COMAR 11.04.02.06, travel times)
SuperloadsOver 150,000 lbs, with an MDOT SHA engineering review of the route. (MDOT SHA Overdimensional Permit Limitations, COMAR 11.04.03.02, excessive weight and size)

Rules change. We checked these rules on October 2, 2026 against the MDOT SHA permit pages, route restriction list and route survey form, the 2026 holiday sheet, the SHA general conditions and COMAR 11.04, and each one against a second source. Rules we could not confirm twice are left off this page. Our permitting team confirms the current rules for every move.

Questions

Maryland heavy haul questions

Do you haul heavy loads in Maryland?

Yes. We are based at 7660 W Third St in Dayton, OH 45417, and we haul oversize and overweight loads across the USA and Canada. Our permitting team pulls the Maryland permit for the Maryland part of the route.

When does a Maryland load need escorts?

Over 13'W or 85'L, 1 escort; at 14'W, 2 escorts; and at 16'W, a police escort.

Can wide loads run all day in Maryland?

At 14'W and over, loads run 9 a.m. to 3:30 p.m. only.

How heavy a load can you haul?

Our superload service handles loads up to 300,000 lbs, with permits, routing and escorts by our own team.

Hauling through other states? Use our permit map and route planner

Open the route planner
USDOT 3906954MC 1441035
Live GPSand a dash cam on every truck
In housepermitting, routing, escorts, utility bucket trucks, maintenance and drivers
USA and Canadawith bonded and non bonded shipments across the Canadian border

Maryland heavy haul quote

Ready to move it?

Send the weight and dimensions, the pickup and delivery points, and your dates. We will work out the permits, route, escorts and equipment.

This page is general information only, not legal advice and not a permit. Rules change often and each state's permit and official rules are the final word. Always confirm limits, escorts, routes and travel times with the state permit office before moving a load. Reliable Transport LLC is not responsible for decisions made using this information.