Port Houston, Texas
Heavy Haul at the Port of Houston
Breakbulk, project and heavy lift cargo out of the Turning Basin, Care and Woodhouse terminals, trucked under Texas permits with escorts from our own team.
This page is general information only, not legal advice and not a permit. Rules change often and each state's permit and official rules are the final word. Always confirm limits, escorts, routes and travel times with the state permit office before moving a load. Reliable Transport LLC is not responsible for decisions made using this information.
Port heavy haul
From the ship's crane to the jobsite
Port Houston calls its Turning Basin the largest breakbulk and project cargo complex in North America. When a vessel brings in machinery, steel or modules there, we are the carrier on the dock. In June 2024 the ship's crane set five wide loads onto our trailers for a run to Arizona, with the permits and route built in house.
Hauling through other states? Use our permit map and route planner
Open the route planner24'W loads
2024- Origin
- Port of Houston, Houston Ship Channel
- Destination
- Arizona
- Loads
- 5 loads 19'W to 24'W, plus 2 at 134'L
- Escorts
- Police escorts and utility trucks
Featured port move
Five wide loads off one ship
The ship's crane set the loads onto our trailers at the Port of Houston. Five ran 19'W to 24'W and two more ran 134'L, all bound for Arizona.
Our team handled the permits and routing in house, then moved the convoy with police escorts and utility trucks to lift lines along the way.



Inside the port
Terminals, gates and permit rules for oversize cargo
Facility facts come from Port Houston. Permit rules come from TxDMV and are confirmed by a second source. Statewide limits, escorts and travel times are on our Texas oversize permit rules page.
Turning Basin terminals
The multi purpose terminals at the Turning Basin, head of navigation since 1914, handle breakbulk, project cargo, heavy lift, RoRo and steel. They have on dock rail and reach Interstate 10, Interstate 610 and Interstate 45.
Gate 8 for high and wide cargo
Gate 8 on Clinton Drive is only for high and wide cargo and has a 30' wide lane. Port Police open it with stevedore approval, so the driver calls them before departure.
Care and Woodhouse terminals
Care Terminal handles breakbulk, project and heavy lift cargo with access to Interstate 10 and Beltway 8. Woodhouse Terminal works project, heavy lift, RoRo and steel cargo.
Leaving the port on a permit
A load 17'6"H or taller needs its permit emailed to the TxDOT Houston District signal shop 48 hrs ahead, and Houston city streets need a City of Houston permit too. On Interstate highways the permit width cap is 16'W.
Sources: Port Houston multi purpose and project cargo; Port Houston gate information; Port Houston multi purpose property directory; TxDMV Houston District restrictions; TxDMV known jurisdictions requiring notification; City of Houston oversize load permit; TxDMV size and weight limits.
More Houston moves
Other heavy loads we moved out of Houston

110,000 lb switchgear building
A 65'L x 17'W x 15'H building at 250,000 lbs gross, Houston, TX to Los Angeles, CA, with state troopers and bucket trucks.

The convoy on the road west
The port loads rolled toward Arizona with escorts front and rear.
Cargo landing at Port Houston?
Send the vessel date, dimensions and weight. We line up the trailer, permits and escorts.
Request a quote →See every move on our Moves page.
Know before you go
Getting a heavy load through the Turning Basin gates
Practical access tips for the Port Houston Turning Basin terminals, each from Port Houston, checked October 12, 2026. We handle this for you: our team checks every gate requirement with the terminal and stevedore before your load is booked.
What does a driver need at a Port Houston gate?
A valid TWIC, a SCAC approved under the UIIA, a truck license plate registered in Port Houston's Lynx portal, and a valid gate transaction. Port Houston notes that a TWIC alone does not guarantee access; access also depends on business need and approval. (Port Houston, Terminal Security and Access, Port Houston, Terminal Gate Process 2026)
Where do cargo trucks check in at the Turning Basin?
Trucks delivering or picking up cargo go first to Cargo Bay Road for prescreening, with their paperwork and TWIC ready. From there the driver is sent to the right gate and stevedore area. A driver without a valid TWIC needs an approved TWIC escort. (Port Houston, Terminal Security and Access, Port Houston, Hours of Operation)
What are the Turning Basin gate hours?
Cargo Bay Road is open 24 hours, 7 days a week. Gate 8 on Clinton Drive, the gate for high and wide cargo, is open Monday to Saturday, 6 a.m. to 8 p.m. (Port Houston, Hours of Operation, Port Houston, Schedules and Gate Information)
How wide is the Cargo Bay Road gate?
Port Houston lists the Cargo Bay Road wide lane gate at 29'6" and the Gate 8 wide lane at 30'. (Port Houston, Schedules and Gate Information)
We handle the gate, the permits and the escorts for you
Email LukeTerminal rules change. Always confirm with the terminal before a pickup; we do this on every booking.
Questions
Port of Houston heavy haul questions
Which Port of Houston gate do oversize loads use?
Gate 8 on Clinton Drive at the Turning Basin is only for high and wide cargo and has a 30' wide lane. Port Police open it with stevedore approval, so the driver must call before leaving.
Do you supply the crane at the port?
No. On our Port of Houston move the ship's crane set the loads onto our trailers. We bring the trailers, permits, routing, escorts and utility trucks.
Which Port Houston terminals handle project cargo?
Port Houston lists breakbulk, project and heavy lift cargo at the Turning Basin, Care Terminal and Woodhouse Terminal. Barbours Cut and Bayport are container terminals.
What does a driver need at a Port Houston gate?
A valid TWIC, a SCAC approved under the UIIA, a truck license plate registered in Port Houston's Lynx portal, and a valid gate transaction. Port Houston notes that a TWIC alone does not guarantee access; access also depends on business need and approval.
Where do cargo trucks check in at the Turning Basin?
Trucks delivering or picking up cargo go first to Cargo Bay Road for prescreening, with their paperwork and TWIC ready. From there the driver is sent to the right gate and stevedore area. A driver without a valid TWIC needs an approved TWIC escort.
What are the Turning Basin gate hours?
Cargo Bay Road is open 24 hours, 7 days a week. Gate 8 on Clinton Drive, the gate for high and wide cargo, is open Monday to Saturday, 6 a.m. to 8 p.m.
How wide is the Cargo Bay Road gate?
Port Houston lists the Cargo Bay Road wide lane gate at 29'6" and the Gate 8 wide lane at 30'.
Hauling through other states? Use our permit map and route planner
Open the route plannerKeep planning
More for your port move
Nearby Texas pages
Port of Houston
Ready to move it?
Send the load dimensions, weight, pickup and delivery points. Our in house team prices the permits, route and escorts and gets back to you fast.
This page is general information only, not legal advice and not a permit. Rules change often and each state's permit and official rules are the final word. Always confirm limits, escorts, routes and travel times with the state permit office before moving a load. Reliable Transport LLC is not responsible for decisions made using this information.